AGT INDUSTRIAL AGT-ECSSLR72 Manuel du produit - Page 8

Parcourez en ligne ou téléchargez le pdf Manuel du produit pour {nom_de_la_catégorie} AGT INDUSTRIAL AGT-ECSSLR72. AGT INDUSTRIAL AGT-ECSSLR72 10 pages. Skid steer landscape rake attachment 72"

OPERATION INSTRUCTIONS
Loader Raking
All raking must be done while moving backward.
1.Activate auxiliary hydraulics for operating rake chain, (If rake chain does not move
but hydraulic cylinder begins to retract, activate auxiliary hydraulics in opposite direction to get rake
chain to operate.)
2.Lower loader arms completely and set loader arm control in float position,
3.Tilt rake forward until the weight of the rake portion is resting on the depth adjustment plates.
4.Move prime mover slowly backward.
To achieve best possible results:
•If rake is throwing too much soil into bucket, depth adjustment plates should be placed in a
lower hole on main housing.
•If the rake is slipping over items that should be collected, then the depth adjustment plates
should be placed in a higher hole on the main housing.
•Multiple passes may be needed to achieve the desired results depending on what those results
are and what the initial conditions are.
•The wide variety of soil types, moisture conditions, compaction levels, foliage densities,
and rock and debris quantities that can be encountered mean that the operator may need to make
adjustments based upon the operator's experience.
Dumping
1.Shut off auxiliary hydraulics.
2.Move to dump site and park on firm, level ground.
3.Activate auxiliary hydraulics in opposite direction of what was used to operate the rake chain. This
will retract hydraulic cylinder and open main housing.
4.Raise rake about four feet above ground.
5.Dump bucket and reverse process. You are ready to resume raking.
P8
https://www.agrotkindustrial.com/