JADO Classic 853/141 Series Instructions d'installation - Page 2

Parcourez en ligne ou téléchargez le pdf Instructions d'installation pour {nom_de_la_catégorie} JADO Classic 853/141 Series. JADO Classic 853/141 Series 2 pages. Pressure balanced bath / shower diverter valve with check stops and trim

TOOLS REQUIRED
Channel Locks
Tubing Cutter
Adjustable Wrench
ROUGHING-IN DIMENSIONS
1
To assure proper positioning in relation to wall,
note roughing-in dimensions.
1-5/8"
TO 3-1/4"
FINISHED WALL
1/2" NPT
"SEE ILLUSTRATION"
OPTIONAL TO
FINISHED
SHW
FLOOR
USUALLY
BETWEEN
7-7/8"
72'' AND 84"
TUB
18" OPTIONAL
4"
3/4"NPT
TOP OF
TUB RIM
BOTTOM OF TUB
OUTLETS 1/2" NPT
5-3/4"
(146 mm)
THREADED
INLETS (STOPS)
1-3/4"
(44 mm)
5-1/2"
INLETS
(140 mm)
2
INSTALL DIVERTER
When finished tiling the wall, remove PLASTER
GUARD (1). Remove two screws that secure the
DIVERTER LID (2) and remove Lid. Inspect the inside
surface of diverter port. Diverter port must be free of
any dirt. Clean if necessary.
Install DIVERTER (3) with SCREWS (4) removed from
DIVERTER LID (2).
Operate DIVERTER (3). DIVERTER (3) should slide in
and out smoothly.
Push on DIVERTER COVER (5).
Phillips Screwdriver
Plumbers' Putty or Caulking
Teflon Tape
ROUGHING-IN
CAUTION
Turn off water at main supply.
NOTE
When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK
STOPS (IF PRESENT). When finished soldering, flush valve body, replace
cartridges, check stops (if present) and plaster guard to continue installation.
Use thread sealant or Teflon tape on threaded connections.
See Roughing-in diagram before starting.
Connections are:
1/2" female NPT for threaded inlets
Connect RISER PIPE (1) to MANIFOLD (2)
top outlet marked "SHR".
Connect TUB FILLER PIPE (3) at bottom
outlet marked "TUB".
For proper positioning the finished wall
1
must be within side wall of PLASTER
GUARD (4).
2
If the valve is installed on a fiberglass or
other thin wall application, the PLASTER
HOT
GUARD (4) can be used as a support.
Cut a 4" dia. hole in the shower stall.
Drill two additional 1" holes to allow
access to the stops.
Remove PLASTER GUARD (4), rotate
180˚ so that indicated screw holes fit
MANIFOLD (2). Push CAP on valve, place
ESCUTCHEON on and attach with screws.
Connect hot and cold water supplies.
Cap off shower pipe (5) and tub filler pipe (6).
For support, use pipe BRACES (7) secured to wooden braces.
With valve turned off, turn on water supplies. Check for leaks.
DIVERTER
PORT
2
3
4
5
1
2
INSTALL TRIM
Push CAP (1) onto VALVE CARTRIDGE (2). Secure CAP (1) to
VALVE CARTRIDGE (2) with SCREW (3) for LEVER HANDLE only.
Regular Screwdriver
(Spline in CAP (1) must fully engage spline on cartridge stem).
Mount ESCUTCHEON HOLDER (16) with gasket and ESCUTCHEON (4)
to valve body with SCREWS 5).
Push the COVER (17) as shown over the CAP (1) and align prongs on COVER (17)
with screw holes in ESCUTCHEON (4).
Important! Make sure COVER (17) snaps over the SCREWS (5).
Thread DIVERTER KNOB (6) onto diverter stem.
2a
5
INSTALL HANDLE (ADJUST HOT LIMIT STOP PRIOR TO
HANDLE INSTALLATION, SEE STEP 3)
7
For Cross Handle: Thread HANDLE BASE (7) onto threads of
CAP (1) until seated against it's internal stop. With VALVE
in off position align CROSS HANDLE (8) as desired. Install
CROSS HANDLE (8) onto VALVE STEM (9) and
tighten HANDLE SCREW (10). Thread
COLD
4
INDEX (11) into CROSS HANDLE (8).
Lever Handles: Thread HANDLE
BASE (12) onto threads of CAP (1)
until seated against it's internal stop.
Install FRICTION WASHER (15) onto
base of LEVER HANDLE (13). Align
LEVER HANDLE (13) and tighten
3
set screw with HEX WRENCH (14)
supplied with faucet to secure
handle.
6
3
ADJUST HOT LIMIT STOP (MUST BE DONE PRIOR TO TRIM INSTALLATION)
By restricting HANDLE rotation and limiting the amount of hot water allowed to mix with the cold, the
HOT LIMIT SAFETY STOP (1) reduces risk of accidental scalding. To set the maximum hot water
temperature of your faucet, all you need to do is adjust the setting on the HOT LIMIT SAFETY STOP (1).
Turn CARTRIDGE STEM (2) to the OFF position (coldest setting) before making adjustment to HOT
LIMIT STOP (1). Use a flat blade screwdriver to pry free the HOT LIMIT SAFETY STOP (1). Pull
forward and rotate counterclockwise one number to limit hot water temperature.
Use ARROW (3) on CARTRIDGE (4) and NUMBERS (5) on HOT LIMIT STOP (1)
for indication.
4
BACK TO BACK INSTALLATION
(SEE ILLUSTRATION STEP 6 FOR REFERENCE)
Remove Handle and Trim from Valve. See
step 2 for reference.
Remove PRESSURE BALANCE UNIT (5). Rotate
PRESSURE BALANCE UNIT (5) 180˚ so that the inlets
face up and the large outlet port faces down.
Push PRESSURE BALANCE UNIT (5) in casting make
sure inlets line up with holes in bottom of casting. Top
flange should butt up against top of casting.
Reassemble FIXATION RING (4) and CARTRIDGE (1).
1 0 9 4 9 6 A
4
6
12
5
15
13
17
7
8
14
10
11
CROSS HANDLE
LEVER HANDLES
3
2
5
1
4
4
(Larger Numbers)
0 1 3 5 7 9 11 13 15
5
TEST INSTALLED FAUCET
Turn VALVE "off". Remove tub filler cap
With HANDLE in "off" position, turn on water supplies and
check all connections for leaks.
Operate HANDLE and flush water lines thoroughly.
Check SPOUT and SHOWER rough pipe connections
for leaks.
1
9
3
16
2
THREADS
ON CAP
GREASE
O-RING
3
2
HOTTER
(Smaller Numbers)
0 1 3 5 7 9 11 13 15
5
COLDER
1
1 0 9 4 9 6 A