Gamko X/ACCELS1 Manuel - Page 2

Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} Gamko X/ACCELS1. Gamko X/ACCELS1 13 pages.

4
X/MU
Recommended order: First segment
left of X/MU and endpanels
place sealing tape
between X/EP and segment
1
th
2
nd
1
1
A
2
3
4
Couple segments
Turn hexagon key (6mm) on all 4 hooks, clockwise on
outside, counter-clockwise from inside segment
2-way action: I hook (make sure they "hook" properly)
II pull (max. 4 "clicks")
7
X/MU
1 Place trafobox bracket over condensor
2 Place trafobox
DETAIL A
5
X/MU
I
II
th
2
nd
1
th
When equipped with electrical accessoires
(such as LED, CELS or heating wire)
Open machinefront and lead wires through cable duct and
down behind machinefront
8
X/MU
CELS
Plug in connectors for LED (and DMX) in
the trafobox.
Plug in connectors for CELS and 24V, in
the junctionbox behind the machinefront
Lead cables through hole
LED
(DMX)
24V
name
destination
1
1
X/MU
6
Connect trafobox
9
X/MU
Neatly tue up excess cables
Check if all accessoires are working properly
Algemene installatie instructie
drawing nr.
Flexbar
02/09 DMX + CELS
02/09 DMX + CELS
5611
5611
draftsman
Gamko Holding BV
Mon Plaisir 75
196169
GB
4879 AL Etten-Leur
Tel.(0)76-5087500
The Netherlands
Blad 2 van 13
date
edda
21-1-2009
X/MU41