ADF ADH100ID Instructions sur les suppléments - Page 3
Parcourez en ligne ou téléchargez le pdf Instructions sur les suppléments pour {nom_de_la_catégorie} ADF ADH100ID. ADF ADH100ID 17 pages. Double sided inbuilt heater zero clearance box
ADF 1000 NMV LINEA ZERO CLEARANCE BOX ASSEMBLY INSTRUCTIONS
Dimensions for Build out (Front elevation):
• The hearth beneath the unit must include 6mm cement sheet to 1275mm x
550mm deep. The hearth in front of the unit must include 6mm cement
sheet with minimum 1240mm x 300mm deep. Total hearth size
1240x1150mm
• No combustibles within 300mm from the top of the Zero Clearance box (i.e.
to first noggin), 100mm to each side (stud).
• No combustible material to be used in construction at all in this cavity space.
• Fan cable must be below the level of the heater base and exit the cavity
below the level of the heater.
1355mm
100mm
1240mm
100mm
300mm
1/11/19
1375mm
Fig. 2
3