Major MT 730 Manuel d'instruction - Page 13
Parcourez en ligne ou téléchargez le pdf Manuel d'instruction pour {nom_de_la_catégorie} Major MT 730. Major MT 730 16 pages. Ac clamp meter
11. CONTINUITY TESTING
1. Set the function switch to
2. Press the
Test range. The meter automatically defaults to
Diode Test.
3. Insert the red test lead into the "V Ω
input terminal and the black lead to the "COM"
terminal.
4. Short the tip of the test leads and make sure the
display reads "0" and the buzzer beeps.
5. Connect the tip of the test leads to the circuit or
component under test. The display reads the
resistance and the buzzer beeps when the
reading is not more than about 120Ω.
Note: • Using resistance and continuity function
in a live circuit will produce false results
and may damage the instrument.
• In many cases the suspicious
components must be disconnected from
the circuit under test to obtain accurate
results
! !
•
make a test, ensure there is no voltage
present on the circuit. .
12
button to select the Continuity
WARNING before attempting to
Buzzer Sounds
range position.
"