All tests should be undertaken during daylight hours at times of minimum risk and be in accordance
with the recommendations of BS 5266 Part1.
DAILY - Check that the three green LED battery charging / lamp failure indicators are illuminated.
MONTHLY - In addition to the daily check, a functional test through simulation of mains supply failure
should be carried out to confirm lamps are illuminated from the battery cell pack supply. This test need
only be approximately 30 seconds. It should not exceed one quarter of the rated luminaire duration.
SIX - MONTHLY - In addition to the monthly test, the lamps should be illuminated from the battery cell
pack supply for a continuous period of at least one hour.
ANNUALLY - In addition to the monthly tests the lamps should be illuminated from the battery cell pack
supply for the full rated duration of the luminaire. (180 minutes).
At the end of each test period the mains supply should be restored and a check made to ensure that
all three green LED battery charging/lamp failure indicators are illuminated.
Warning:
Please note once unit is installed the battery should be kept charged, failure to do so will reduce the
battery life.
When unit is commissioned the battery label should be dated with the commissioning date and record
sheet completed for the first test. Failure to do this may invalidate the warranty.
LUMINAIRE TYPE/REF:_________________________________
DATE OF INSTALLATION:_______________________________
LOCATION:________________________
Month
Test
1
Functional
2
Functional
3
Functional
4
Functional
5
Functional
6
Functional
7
Functional
8
Functional
9
Functional
10
Functional
11
Functional
Three Hour
12
Functional
ROUTINE INSPECTION & TEST PROCEDURE
EMERGENCY LUMINAIRE TEST RECORD SHEET
1st Year
Signed Date Signed Date Signed Date Signed Date Signed Date
2nd Year
3rd Year
4th Year
5th Year