A&E Systems 972 Oasis-Elite Series Manuel d'utilisation - Page 2

Parcourez en ligne ou téléchargez le pdf Manuel d'utilisation pour {nom_de_la_catégorie} A&E Systems 972 Oasis-Elite Series. A&E Systems 972 Oasis-Elite Series 7 pages. Automatic and manual rv door awning system

SAFETY INSTRUCTIONS

This manual has safety information and instructions
to help users eliminate or reduce the risk of acci-
dents and injuries.
RECOGNIZE SAFETY INFORMATION
!
This is the safety-alert symbol. When you see this
symbol in this manual, be alert to the potential for
personal injury.
Follow recommended precautions and safe oper-
ating instructions.
UNDERSTAND SIGNAL WORDS
A signal word , WARNING OR CAUTION is used
with the safety-alert symbol. They give the level of
risk for potential injury.
WARNING
: means if the safety information is
not followed someone could be injured or killed
and/or damage to equipment could occur.
CAUTION:
means if the safety information is
not followed someone might be injured and/or
damage to equipment might occur.
Read and follow all safety information and instruc-
tions.
Learn how to operate the awning properly.

GENERAL INFORMATION

IMPORTANT !
Important:
Read all of the following steps before
beginning installation.
The Dometic Corporation reserves the right to modify appear-
ances and specifications without notice.
Important:
This awning must be installed by a quali-
fied person.
A. POSITION OF THE AWNING
1 . Before beginning installation of the case, be sure the
door will open when the awning is completely ex-
tended. Allow for a natural downward slant of the
awning. Check for a solid backing or under-structure
where screws are to be used.
3 . Before drilling, be sure that there are no obstacles
inside the wall (cables, wires, gas pipes, etc.).
4 . Minimum clearance from bottom of case to door is
3.00 inches.

INSTALLATION INSTRUCTIONS

A.AWNING RAIL INSTALLATION
1 . Secure awning rail to side of RV at the desired location
using # 6 x 1" wood screws (not provided). Awning rail
must be located at least 8" above the door. This will
allow the door to open when the awning is in the extend
p o s i t i o n .
Important:
Structural backing is required where
mounting screws will be installed through sidewalls for
securing Awning Rail.
FIG. 1
FIG. 1
FIG. 1
FIG. 1
FIG. 1
2
AWNING RAIL
AFTER
FLARING