alkitronic HSD 400 Manuel d'utilisation et d'entretien - Page 8
Parcourez en ligne ou téléchargez le pdf Manuel d'utilisation et d'entretien pour {nom_de_la_catégorie} alkitronic HSD 400. alkitronic HSD 400 16 pages. Mounting documentation system
Operation and Maintenance Manual
350
Nm
OK
The system will start after a waiting time of five seconds. If
during this waiting time the <Enter> key is pressed, the system
is immediately ready for the next bolting process.
When further bolting process are carried out the counter will
be increased. The number of completed and the grand total
number of bolting processes are shown in the display.
If, however, the maximum number of bolting processes has
been reached, the program will terminate and the system will
return to the main menu.
End?
>
No
Yes
answer with the cursor key
the <Enter> key.
5.1.4 Assessment criteria
Depending on the assessments as follow the result is stored:
Status
> max. torque
< min. torque
Between max. and min. torque
5.1.5 Documentation
Value
Content
Year/Month/Day/hours/minutes
ID
Global counter ID (incremented by each process)
Program
1
Current torque
Maximum value during the measurement
Target torque
As predefined
Min. Torque
As predefined
Max. Torque
As predefined
Status
OK / not OK
Display: The currently measu-
red max. torque and the evalu-
ation of the screwing process is
shown as "OK" or "nOK".
Note:
If during a screwing process the
<Enter> key is pressed, a query
will be displayed: End program?
No – Yes. Select the correct
( ↓ ) ( ↑ )
and confirm by pressing
Status
Not OK
Not OK
OK
5.2
Bolting program 2
Exclusively for the
HSD model of
MDS product range.
Make the program
selection in the
main menu.
5.2.1 Application description
Bolted joints are tightened with a torque and rotation angle
setting. The target torque value can be entered with tolerance
limits. The actual torque applied and the angle achieved is
stored in memory.
5.2.2 Parameter setting
•
Number of boltings
•
Min. torque
•
Max. torque
•
Pre-set torque
•
Target angle
When setting the parameters plausibility must be
maintained. Note that the pre-torque is smaller
than the minimum torque, and this must be lower
than the maximum. All torque values must be limi-
ted between the minimum and maximum torque
value of the torque multiplier (see parameter table
4.1).
5.2.3 Process description
During the screwing process the torque is increased con-
tinuously. As soon as the torque reaches the switching on
level (value see parameter table 4.1) the program will show
the most current maximum torque. If the torque exceeds the
predefined pre-torque the angle measurement commences.
As soon as the angle is greater than the predefined target
angle (minus 5% tolerance) and the currently torque is greater
than the minimum torque the user is notified by a visualization
lasting two seconds with a green light and single continuous
signal tone once.
If the currently measured torque increases further and ex-
ceeds the predefined maximum torque, the user is notified
by a single continuously fluctuating signal tone and the
lighting of a red signal light. Only when the current torque
drops below the maximum redefined value or the <Enter>
key is pressed, the warning will be terminated. If the current
drops below the switching level the current screwing data
set is stored in memory.
8
The parameters on the left-
must all be entered to ensure
correct data recording and
evaluation.