Kohler K-1164 Manuel d'installation - Page 10

Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} Kohler K-1164. Kohler K-1164 44 pages. Bath with airjets
Également pour Kohler K-1164 : Manuel du propriétaire (32 pages), Manuel du propriétaire (29 pages), Manuel d'installation (48 pages), Manuel du propriétaire (36 pages), Manuel d'installation (4 pages), Manuel d'installation et d'entretien (21 pages), Manuel du propriétaire (29 pages)

Kohler K-1164 Manuel d'installation
Make sure air actuator tubing is
securely attached to the pump.
Bond in accordance with applicable codes.
NOTE: Pump model illustrated may differ from your
actual product.

8. Make Electrical Connections

WARNING: Risk of electrical shock. To reduce the risk of electrical shock, connect the pump to a
properly grounded Ground-Fault Circuit-Interrupter (GFCI). This will provide additional protection
against line-to-ground shock hazard. A 120 V, 15 A dedicated circuit is required.
WARNING: Risk of electrical shock. Make sure the power has been disconnected before performing
the following procedures.
Locate and secure the supplied junction box a minimum of 1-1/2" (3.8 cm) above the subfloor.
The whirlpool controls and system have been prewired at the factory. A licensed electrician should
make a routine service connection to the junction box.
Connect service to the junction box. The 60 Hz model junction box contains black and white wires
and a ground lug.
A 120 V, 15 A dedicated circuit is required. Provide a Class A Ground-Fault Circuit-Interrupter
(GFCI).
Provide a separate equipment grounding conductor for the inside ground or ground lug. The
conductor must not be connected to any current-carrying conductor.
Bond in accordance with national and local codes.
1010914-2-D
Pump
Electrical
Cord
10
Junction box should be
wired as shown.
Ground
Neutral
(White)
Electrician to
provide suitable
Neutral
strain relief.
Wire Connectors
From Pump
Line
(Black)
Line
Kohler Co.