Kohler Iron Works Tellieur K-727 Manuel d'installation - Page 6
Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} Kohler Iron Works Tellieur K-727. Kohler Iron Works Tellieur K-727 25 pages. Freestanding cast iron bath
Également pour Kohler Iron Works Tellieur K-727 : Manuel d'installation et d'entretien (29 pages)
Drain End
Assembly
Dowels
Barrel Nut
Note: Drain end assembly installation shown. For the curved end piece
installation, substitute the curved end piece for the drain end assembly.
5. Install the Wood End Pieces
Press the barrel nuts into the holes in the drain end assembly with a flatblade screwdriver. Make
sure each barrel nut head is flush with or slightly below the surface of the wood.
Carefully fit the drain end assembly against the outriggers and onto the dowels.
Press the drain end assembly fully against the outriggers to eliminate any gaps.
Insert the connecting bolts so they fit through the outrigger holes.
Thread the bolts into the barrel nuts.
Use the provided hex wrench to turn and tighten the connecting bolts to secure the drain end
assembly to the outrigger leg.
Repeat for the curved end piece.
1007292-2-B
Drain End
Assembly
6
Drain End
Assembly
Dowels
Outrigger
Barrel Nut
Connecting
Bolt
Hex
Wrench
Outrigger
Kohler Co.