To install supply shut-off valve
Install toilet supply shut-off valve so it is 140mm above
floorline and 135mm to the left of the centerline of the
closet flange. Centerline of supply shut-off outlet should
extend 102mm from finished wall. Install the supply shut-
off valve with outlet vertcial.
135mm
5
Install the wax seal.
NOTE 1:
Wax ring type toilet gasket should not be installed at
temperatures less than 21 .
NOTE 2:
If you are using a toilet gasket with an integral
plastic sleeve, make sure the gasket is positioned with the
sleeve facing away from the toilet.
If you temporarily plugged the closet flange with a rag,
remove the rag at this time and ensure that the drain pipe is
clear and free of debris.
1
2
6
Apply weight evenly.
Do not move after placement!
Watertight seal may be broken!
1264349-T01-A
140mm
102mm
21
140
305
Wax Seal
7
Install floor mounting kit as shown in the figure.
overtighten.
-4-
Supply Shut-Off Valve
135
Closet Flange
Centerline
This side up.
Do not