Kohler Escale K-25090T-S Manuel d'instructions d'installation - Page 20

Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} Kohler Escale K-25090T-S. Kohler Escale K-25090T-S 30 pages. Floor standing toilet
Également pour Kohler Escale K-25090T-S : Manuel d'instructions d'installation (23 pages), Manuel d'instructions d'installation (11 pages), Manuel d'instructions d'installation (28 pages)

Kohler Escale K-25090T-S Manuel d'instructions d'installation
2) Tighten four screws to "LOCK" mark after installing
supporting board as shown.
2)
3) Install the big flush air hose and small flush air hose to
the cover.
Put the lock on the cover directly on the
reversed lock on supporting board, then push the cover
and lock it. The installation shall begin from bottom to
top.
Note:
Cut the excessive parts of the air hose if necessary
and fix it onto the tank fastener.
3)
Connect to air hose
4) It is ready to use when connected to water supply after
installation.
Note:
Reserve access panel at front or top of the tank in
remote installation.
4)
2. K-23055T-PNE installationn
2. K-23055T-PNE
1)
Suggested faceplate fixed frame installation direction
1)
1288818-T01-B
LOCK
Full Flush
Button
.
-14-
Faceplate
Lock
Supporting
Board
Fastener
Up
Faceplate
Half Flush Button