Kohler K-1382T-XTS Manuel d'instructions d'installation - Page 2

Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} Kohler K-1382T-XTS. Kohler K-1382T-XTS 8 pages.

TOOLS AND MATERIALS REQUIRED (Not
supplied)
·
254mm (10") adjustable wrench
·
305mm (12") pipe wrench
·
Metal file (file cut)
·
Tape measure
·
Tubing cutter
·
Level
·
Hacksaw
·
Putty knife
·
Screwdriver
·
Toilet gasket (wax seal)
·
Toilet T-bolts (2), 8mm (5/16") diameter
·
Toilet supply shut-off valve, 10mm(3/8 ) recommended
NOTICE:
If the existing toilet does not have a supply shut-off
valve below the tank, install one before installing the new
toilet.
Reference Value
Finished
Wall
305/400

INSTALLATION

TO REMOVE EXISTING TOILET
Turn off the water supply. Flush the toilet, and use a sponge
to remove the remaining water from the tank and bowl.
Disconnect the supply shut-off valve (if present), and remove
the old tank and bowl.
1371050-T01-A
"
725
387
393
Kohler reserves the right to change marked dimensions without prior notice.
·
254mm
·
305mm
·
·
·
·
·
·
·
·
·
8mm T
·
692
190
200
Fig.#1
1
-2-
2
10mm
280
320
375
(
)
Unit: mm
:
311
225
311