Kohler 20EFKOZD Manuel d'instructions d'installation - Page 5

Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} Kohler 20EFKOZD. Kohler 20EFKOZD 12 pages.
Également pour Kohler 20EFKOZD : Manuel d'instructions d'installation (8 pages)

Kohler 20EFKOZD Manuel d'instructions d'installation
2.6
Ground lead connection. Connect the lead
(LK-0616-1715) to the ground stud located inside
the junction box using nut (M6923-06-80), washer
(M125A-06-80), lock washer (X-22-12 qty. 2), and
screw (M933-06020-60). Route the lead under the
U-channel shown in Figure 6. Connect the other
end of the lead to the customer connection panel
location. See Figure 9.
2.7
Fuel line connections. See Figure 9 for fuel
supply and return connection locations.
2.8
Secure the U-channel (X-6047-14) as shown in
Figure 6.
1
2
3
1. Customer connestion panel (GM93558 or GM95124)
2. Opening for exhaust tube.
3. Lead (LK-0616-1715).
4. Battery cable (X-545-259). Attach positive battery cable to
the starter motor.
5. Hose clamps (X-426-12 qty. 2). Attach seawater inlet hose to
inlet on the seawater pump.
6. Hose (X-373-30)
7. Battery cable (X-545-241 or X-545-176). Attach negative
battery cable to the engine block.
8. Insulated clamp (X-672-32)
9. Attach lead to the ground stud located inside of the junction
box using nut (M6923-06-80), washer (M125A-06-80),
lock washer (X-22-12 qty. 2), and screw (M933-06020-60).
Figure 9 Customer Connection Panel Connections
TT-1651 4/17a
4
5
6
7
9
8
GM93548-J
1. New location for existing hose connector
2. Route harness (GM96427) from temperature sensor to engine
harness.
Figure 10 New Location for Existing Hose Connector
1
2
GM93548-J
5