Kohler K-97630 Manuel d'installation et d'entretien - Page 3

Parcourez en ligne ou téléchargez le pdf Manuel d'installation et d'entretien pour {nom_de_la_catégorie} Kohler K-97630. Kohler K-97630 29 pages. Locker
Également pour Kohler K-97630 : Manuel d'installation et d'entretien (29 pages)

Kohler K-97630 Manuel d'installation et d'entretien
2x4 Bracing
65"
(1651 mm)

1. Prepare the Site

IMPORTANT! Water resistant wallboard backing material is recommended.
Install the rough plumbing for the bath and shower components.
Check the studs for plumb. Studs should be within 3/8" (10 mm) of plumb, shim if necessary.
Determine the height of the locker unit.
Install 2x4 bracing where the locker unit will be placed following the dimensions shown above.
Install wallboard backing material over the locker unit opening with the same dimensions as the 2x4
bracing cut out.
Kohler Co.
K-97630: 9" (229 mm)
K-97631: 14-1/2" (368 mm)
Wallboard
Backing
65"
(1651 mm)
3
K-97630: 9" (229 mm)
K-97631: 14-1/2" (368 mm)
1248926-2-A