2Power 2P 400l Manuel d'instructions d'installation - Page 3

Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} 2Power 2P 400l. 2Power 2P 400l 8 pages. Storage tank

2.1. Regulations and guidelines
Follow the relevant accident prevention regulations, environmental regulations and statutory
rules for assembly, installation and operation, as well as the relevant safety regulations of
DIN, EN, DVGW, VDE and VDI and any national standards, laws and regulations.
The electrical wiring work may only be carried out by qualified electricians. The rules as well
as the guidelines of the competent power supply company have to be kept.
The hydraulic connection work may only be carried out by qualified personnel. The valid rules
and regulations have to be kept.
2.2. Transport
At the receiving, the storage and accessories must be checked for possible
transport damage. Neither the manufacturer nor the supplier is liable for shipping
damages, but the freight carrier. After the acceptance of goods without objections
transport damages can no longer be asserted.

3. Installation

The installation, start-up, as well as maintenance and repair of the device may only
be carried out by an expert technician. A safety valve is necessary at the cold water
pipe. The device has to be run with pressure fittings.
3.1. Site
Be sure that the floor is stable
Be sure that the floor is even
Pay attention to ceiling height and tilted dimensions (see chapter 5: "Technical Data")
3.2. Insulation
Place the device at its location and align it according to the installation. At this pay attention
to sufficient assembly freedom. Then assemble the insulation. After assembling the insulation
you can start with the integration to the heating and hot water system.
3.3. Vent valve
Assemble a manual vent valve at the vent nozzle (12)
InstAnl.V08-2014-0
The storage may only be transported upright!
For transporting you can use the hooks on the top of the tank.
Pagina 3 ǀ 8