Aqua Creek F-004PLB-26 Manuel d'installation et d'utilisation - Page 3
Parcourez en ligne ou téléchargez le pdf Manuel d'installation et d'utilisation pour {nom_de_la_catégorie} Aqua Creek F-004PLB-26. Aqua Creek F-004PLB-26 17 pages. Pro pool lifttm extended base
PRO POOL LIFT: 4 – POINT ANCHOR INSTALLATION
NOTE: THE PRO POOL LIFT ANCHOR CAN BE INSTALLED IN EITHER A
NEW POOL DECK OR AN EXISTING DECK.
RETRO-FIT INSTALLATION / EXISTING DECK APPLICATION
TOOLS REQUIRED:
MARKING PEN/PENCIL
2 " C O R E D R I L L B I T
POWER DRILL
1. Locate the anchor jig and the FOUR (4) anchor bolts.
2. Determine the anchor locations using FIGURE 1 and the following
information. The SETBACK DISTANCE is the distance from the pool
wall to the CENTER of the front two anchors. For the -23 unit
(F-004PLB-2 3 ) t h e MA X I MU M S E T B A C K D I S T A N C E i s 2 3 " . F o r
the -26 unit (F-004PLB-2 6 ) t h e m a x i m u m s e t b a c k i s 2 6 " . Place the
anchor jig plate at the desired location as shown in FIGURE 3 and
mark the four locations. Keep the jig plate parallel to the pool wall.
3. Re m o v e t h e 1 " h e x n u t s f r o m t h e a n c h o r b o l t s and core drill a 1-1/4
inch [32mm] hole at the four anchor locations. Remove the core and
all debris from the holes. Use a hammer and chisel if necessary.
4. Fill each hole approximately ½ full with high strength anchor
adhesive.
5. Install the FOUR (4) anchor bolts into the holes. Make sure that the
top of the bolts are flush and plumb with the top of the pool deck.
6. Let the adhesive cure a s p e r t h e m a n u f a c t u r e r ' s i n s t r u c t i o n s before
installing the PRO POOL LIFT
*Use HILTI HIT HY-150 or SIMPSON ET22 StrongTie anchor adhesive or equivalent.
LEVEL
HIGH STRENGTH ANCHOR ADHESIVE*
HAMMER & CHISEL
.
TM
ANCHOR BOLTS
(SHOWN WITH HEX-
NUTS – REMOVE NUTS
FOR RETRO-FIT)
3