ab Solares Smart Spa Manuel d'installation - Page 6

Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} ab Solares Smart Spa. ab Solares Smart Spa 17 pages.

Bathing Room Preparation
-Choose flattest possible floor location. Floor must not slope more than ¼
in (6.35 mm) per 12 in (304.8 mm) for Secure Glide
operate correctly.
-Use of this equipment adjacent to or stacked with other equipment should
be avoided because it could result in improper operation. If such use is
necessary, this equipment and the other equipment should be observed to
verify that they are operating normally
-Portable RF communications equipment can affect medical electrical
equipment. Such equipment should be used no closer than 12" from the
tub.
Bathing room characteristics, including room dimensions, door sizes and
floor drain placement, must comply with all applicable building and health
codes.
• Clearance of 18 in (46 cm) or more is recommended for ease of use
and serviceability.
• A floor drain is recommended in the bathing room in case an
emergency tub evacuation is required. Drain should not be in a
location that will interfere with resident transfer.
• Be sure Rapid Fill
items that must be reached by personnel.
CD0037
TM
Solares
Smart Spa Installation Manual
!WARNING!
CAUTION
NOTE
TM
system does not cover switches, valves, or other
-6-
TM
Transfer System to
1121