Aqua Creek Products F-EZPL2 Instructions d'installation, d'assemblage et d'utilisation - Page 7
Parcourez en ligne ou téléchargez le pdf Instructions d'installation, d'assemblage et d'utilisation pour {nom_de_la_catégorie} Aqua Creek Products F-EZPL2. Aqua Creek Products F-EZPL2 12 pages. Pool lift and hard seat option
Également pour Aqua Creek Products F-EZPL2 : Manuel (11 pages), Manuel (12 pages)
ASSEMBLY INSTRUCTIONS – EZ POOL LIFT™
9/16" Wrench
The EZ Pool Lift™ arrives with the boom arm attached to the mast. To complete the
assembly, layout all parts needed on a large
clean area.
STEP 1:
Locate the Hydraulic ram and attach the upper
end of the hydraulic ram to the boom with one
(1) 3/8" x 1-3/4" hex head bolt, two (2) 3/8" flat
washers, and one (1) 3/8" nylock nut.
STEP 2:
Connect the lower end of the hydraulic ram to
the mast with one (1) 3/8" x 1-1/2" hex head bolt,
two (2) 3/8" flat washers, and one (1) 3/8" nylock
nut.
MAKE SURE THAT THE 3/8" ROD END IS ALWAYS
FULLY SEATED WITH THE MAXIMUM ALLOWABLE
THREAD BEING USED.
STEP 3:
Install lift into previously installed anchor socket in the pool deck. Make sure that the mast
is seated at the bottom of the anchor. Check to ensure easy rotation of the lift in nylon-
lined anchor sleeve.
STEP 4:
Locate the four (4) internal sling support bars
and insert them into the sewn pockets in the
mesh sling.
EZINST-11/22/10
REQUIRED TOOLS
3/4" Wrench
!WARNING!
© Aqua Creek Products LLC 2003-2010
INTERNAL SLING
SUPPORT BAR
STEP 4
Page 7 of 12