CPI GRYPHON Manuel du technicien - Page 5
Parcourez en ligne ou téléchargez le pdf Manuel du technicien pour {nom_de_la_catégorie} CPI GRYPHON. CPI GRYPHON 5 pages. Coin changer
Également pour CPI GRYPHON : Manuel d'installation (4 pages)
Alignment
After installing the coin changer:
1
Ensure there is a small gap (1a) of 2-4 mm (0.08-0.16 in) between the reject lever on the vending machine (1b) and the
return lever on the coin changer (1c).
2
Press the coin return lever on the vending machine door. Confirm that it fully opens the validator door on the coin changer,
and then smoothly returns and fully closes.
3
Check alignment of the coin entry chute on the vending machine, ensuring it does not impede operation of the validator
door on the coin changer.
4
Align, adjust, and test as necessary to ensure coins are properly routed before continuing.
Coin entry chute size and alignment
B
C
D
E
F
G
Letter
Measurement or description
A
Reference mounting hole axis
B
39 mm (1.54 in)
C
36.5 mm (1.44 in)
D
3.5 mm (.14 in)
E
Diameter = 33 mm (1.3 in)
F
Coin entry chute
G
3 mm (.12 in)
H
50 mm (1.97 in)
I
46.5 mm (1.83 in)
J
Maximum coin thickness = 3.5 mm (.14 in)
Compliance
Gryphon coin changer meets domestic and international standards for emission, safe product design, and environmental regulations. Contact your CPI
service representative for details.
© 2023 Crane Payment Innovations. All rights reserved.
v1.0 EN
A
1b
1a
H
1c
I
J
CPI support
5