Dell PowerEdge FX2 Manuel de configuration - Page 13
Parcourez en ligne ou téléchargez le pdf Manuel de configuration pour {nom_de_la_catégorie} Dell PowerEdge FX2. Dell PowerEdge FX2 24 pages. Upgrading from 10gbe pass-through modules to fn410s i/o modules
Également pour Dell PowerEdge FX2 : Pour commencer (2 pages), Mise en route du système (2 pages)
FC630
Slot 1
FC630
Slot 3
5. After the FC630 server's CNA ports are up, a north-south connectivity check is done by pinging the
servers in the FX2 chassis from an upstream device on all applicable VLANs traversing FN410S-A1.
The upstream server at 10.0.0.6 successfully pings the FX2 servers at 10.0.0.1 and 10.0.0.3 through
the ToR and FN410S-A1 on the default VLAN.
PTM-A2 is not affected and functions normally.
6. An east-west connectivity check is done by pinging between the servers in the FX2 chassis on all
applicable VLANs traversing FN410S-A1.
The FC630 server at 10.0.0.1 successfully pings the FC630 server at 10.0.0.3 through FN410S-A1 on
the default VLAN without going through the ToR switch.
Note: If you want to verify east-west traffic bypasses the ToR switch by shutting port channel 128,
disable UFD on the FN410S first. Instructions for disabling and re-enabling UFD are in the appendix of
the
Dell PowerEdge FN IOM Easy Deployment Guide.
13
PowerEdge FX2 - Upgrading from 10GbE Pass-through Modules to FN410S I/O Modules | version 1.0
Step-by-Step Example: Upgrade Midpoint
FX2 Chassis
CNA port 1
10.0.0.1
te 0/1
FN410S-A1
CNA port 2
te 0/5
192.168.1.1
port 1
CNA port 1
10.0.0.3
PTM-A2
CNA port 2
port 5
192.168.1.3
Upgrade midpoint with one PTM and one FN410S installed
Po 128
te 0/9
Switch
Po 10
te 0/10
te 1/5
te 1/6
S4048-ON
te 1/3
te 1/4
port 1
port 5
default VL AN
VL AN 6
ToR
Upstream
port 1
10.0.0.6
te 1/9
te 1/10
port 2
192.168.1.6
Server