Dell EMC PowerSwitch S5148F-ON Manuel d'installation - Page 22

Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} Dell EMC PowerSwitch S5148F-ON. Dell EMC PowerSwitch S5148F-ON 45 pages.
Également pour Dell EMC PowerSwitch S5148F-ON : Manuel de configuration (20 pages)

Dell EMC PowerSwitch S5148F-ON Manuel d'installation
Figure 11. Two-post center-mount threaded round-hole installation
2. Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws. See item 2 and 3.
3. Repeat this procedure for the second rail.

Four-post threaded installation

NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
CAUTION:
To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in
Step 1.
1. For this installation, remove the tool-less latch castings from the front side of each ReadyRails assembly. See item 1. Use a
Torx screwdriver to remove the two screws from each front latch on the switch side of the rail. Remove the tool-less latch
casting. Retain the castings for future rack requirements.
22
S5148F-ON switch installation