Dell EMC PowerSwitch S5148F-ON Manuel de configuration - Page 12
Parcourez en ligne ou téléchargez le pdf Manuel de configuration pour {nom_de_la_catégorie} Dell EMC PowerSwitch S5148F-ON. Dell EMC PowerSwitch S5148F-ON 20 pages.
Également pour Dell EMC PowerSwitch S5148F-ON : Manuel d'installation (45 pages)
Figure 4. Two-post flush-mount installation
2. Attach one rail to the front post flange with two user-supplied screws, item 2.
3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two
user-supplied screws, item 3.
4. Repeat this procedure for the second rail.
Two-post center-mount installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two
user-supplied screws, item 1.
12
S5148F-ON switch Installation