Dell S4128F-ON Series Manuel d'installation - Page 23
Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} Dell S4128F-ON Series. Dell S4128F-ON Series 47 pages.
Également pour Dell S4128F-ON Series : Manuel d'installation (48 pages)
Figure 11. Two-post flush-mount installation
2
Attach one rail to the front post flange with two user-supplied screws, item 2.
3
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied
screws, see item 3.
4
Repeat this procedure for the second rail.
Two-post center-mount installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied
screws, item 1.
S4100–ON Series installation
23