AVZ Twins Piazzola Instructions d'installation - Page 16

Parcourez en ligne ou téléchargez le pdf Instructions d'installation pour {nom_de_la_catégorie} AVZ Twins Piazzola. AVZ Twins Piazzola 20 pages. Gastro awning

AVZ Twins Piazzola Instructions d'installation
Assembly instructions Twins
Piazzola
Butterfly awning
®
®
26. Take the water gutter profiles and drill holes of 5 mm at intervals of ± 60 cm along the drill line.
27. Screw a cover plate against the front of the water gutter.
28. Hook the water gutter profiles into the side guide, keeping the cover plate on the front flush with the
front of the side guide, and screw into place.
29. Extract the front profile by 30 cm.
30. Slide the side guide over the wheels of the guide blocks leg of the cover support.
31. Attach the side guide to the legs of the cover supports.
32. Place the two hinges at the desired positions above one another, and connect these.
33. Measure the Twins Piazzola® diagonally and ensure that the system is perfectly perpendicular.
34. Tighten the nuts on the side of the suspension bracket.
35. Hook the springs on the left and right into the screw eyes of the guide blocks.
36. Place the pulley on the other side of the spring.
Page 16
Twins Piazzola EN 27-08-2018