360 Yield 360 Y-DROP HAGIE ALUMINUM BOOM Manuel d'instruction - Page 7
Parcourez en ligne ou téléchargez le pdf Manuel d'instruction pour {nom_de_la_catégorie} 360 Yield 360 Y-DROP HAGIE ALUMINUM BOOM. 360 Yield 360 Y-DROP HAGIE ALUMINUM BOOM 12 pages.
INSTALL YOKE ASSEMBLIES
IV.
ON THE CENTER SECTION
Figures 10 and 11
Step 1
With the U-bolt pointing down, install the
yoke mount (1) and flange nuts to upper
boom section.
Step 2
With the square U-bolt threads pointing
up and using the extra thick washer and
Nylock nut, install yoke mount (2) to the
360 Y-DROP boom section.
Step 3
Using pins, install the yoke straps (3)
between the upper boom and 360
Y-DROP boom. Using the flange nuts,
tighten the 1-1/4" carriage bolts.
Repeat Steps 1-3 for the other yoke on the center section.
INSTRUCTIONS 360 Y-DROP
Figure 10
Figure 11
360YIELDCENTER.COM
HAGIE ALUMINUM BOOM
1
3
2
7