360 Yield 360 Y-DROP JOHN DEERE 4720 Manuel d'instruction - Page 5

Parcourez en ligne ou téléchargez le pdf Manuel d'instruction pour {nom_de_la_catégorie} 360 Yield 360 Y-DROP JOHN DEERE 4720. 360 Yield 360 Y-DROP JOHN DEERE 4720 13 pages.

INSTALL SQUARE TUBE
III.
BRACKET ON OEM PRIMARY BOOM
NOTE: The second mounting location requires special
instructions. See pg. 6 for more information.
Figure 6
Step 1
With the threads pointing down, install
U-bolt (1) on front OEM boom. Install
bracket assembly (2) and the nuts onto
the front OEM boom.
Bag AA
Step 2
With the threads pointing down, install
U-bolt (3) over the rear OEM boom. Install
bracket assembly (4) and nuts onto the rear
OEM boom.
Bag EE
Step 3
Install extension tube (5) into bracket
assemblies (2) and (4).
Step 4
Install 360 Y-DROP boom bracket (6) onto
extension tube (5).
Bag BB
Step 5
Install set screw (7).
Hardware Kit A within Bag BB
Figure 7
Step 6
Install set screws (8).
P/N 207042 Hardware Kit D
within OEM Boom Bracket Kit
Step 7
Install stop bolt assemblies (9) at the
front and rear of the extension tube.
Hardware Kit B within Bag BB
Repeat Steps 1-7 for the remaining sprayer
mount packages.
INSTRUCTIONS 360 Y-DROP
3
1
2
Figure 6
9
Figure 7
360YIELDCENTER.COM
JOHN DEERE 4720
5
4
6
7
8
5