360 Yield 360 Y-DROP NEW HOLLAND Manuel d'instruction - Page 5
Parcourez en ligne ou téléchargez le pdf Manuel d'instruction pour {nom_de_la_catégorie} 360 Yield 360 Y-DROP NEW HOLLAND. 360 Yield 360 Y-DROP NEW HOLLAND 12 pages.
2008 + CENTER SECTION
III.
SQUARE TUBE INSTALLATION
Figures 6 and 7
Step 1
Install bolts (1) over the OEM center
section boom.
Step 2
Place 14" top plates (2), spacer plate (3)
and bracket assembly (4) into position
and install 3/8" flange nuts (5).
Step 3
Install extension tube (6) onto bracket
assembly (4).
Step 4
Install carriage bolts (7) and the
flange nuts.
Step 5
Install boom bracket (8).
Step 6
Install stop bolt assemblies (9) at the
front and rear of the extension tube.
INSTRUCTIONS 360 Y-DROP
Figure 6
9
6
4
Figure 7
360YIELDCENTER.COM
MILLER
NEW HOLLAND
3
8
2
1
7
5
2
5
7
4
5