ABB AP103 Manuel - Page 6

Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} ABB AP103. ABB AP103 16 pages. Ph/redox (orp) cartridge sensors with water-wash option
Également pour ABB AP103 : Manuel d'instruction (16 pages)

ABB AP103 Manuel

2 INSTALLATION

2.1 Typical Installation

A typical installation is shown in Fig. 2.1, with offset ported
flowcell arrangements illustrated in Fig. 2.3. A recommended
installation for samples which may have entrained air or are
subject to intermittent flow is shown in Fig. 2.2.
To prevent spillage
when cartridge is
removed.
Sample Flow
Fig. 2.1 Typical Installation
Fig. 2.2 Recommended Installation for Samples with Entrained Air or Intermittent Flow
4
To ensure that the cartridge
is always in solution.
Drain
Vent
A
Approximately 15°
Clamp (Optional)
IN
Fig. 2.3 Installation of Offset Ported Flowcell Assembly
To prevent spillage when
cartridge is removed.
B
Point B must be lower than point A
to ensure that the cartridge is always
in solution.
3
/
in NPT
8
Male Stud Couplings
(not supplied)
OUT
Recommended clamps
(not supplied)
Drain