Miller 029015507 Manuel du propriétaire - Page 29
Parcourez en ligne ou téléchargez le pdf Manuel du propriétaire pour {nom_de_la_catégorie} Miller 029015507. Miller 029015507 40 pages.
4-15. Connecting 3-Phase Input Power (Continued)
!
Installation must meet all National and
Local Codes − have only qualified per-
sons make this installation.
!
Disconnect and lockout/tagout input
power before connecting input con-
ductors from unit. Follow established
procedures regarding the installation
and removal of lockout/tagout de-
vices.
!
Always connect green or green/yellow
conductor to supply grounding termi-
nal first, and never to a line terminal.
NOTICE − The Auto-Line circuitry in this unit
automatically adapts the power source to the
primary voltage being applied. Check input
Notes
voltage available at site. This unit can be con-
nected to any input power between 208 and
575 VAC without removing cover to relink the
power source.
See rating label on unit and check input volt-
age available at site.
For Three-Phase Operation
1
Input Power Cord.
2
Disconnect Device (switch shown in the
OFF position)
3
Green Or Green/Yellow Grounding
Conductor
4
Disconnect Device Grounding Terminal
5
Input Conductors (L1, L2 And L3)
6
Disconnect Device Line Terminals
Connect green or green/yellow grounding
conductor to disconnect device grounding ter-
minal first.
Connect input conductors L1, L2, and L3 to
disconnect device line terminals.
7
Over-Current Protection
Select type and size of over-current protec-
tion using Section 4-14 (fused disconnect
switch shown).
Close and secure door on disconnect device.
Follow established lockout/tagout procedures
to put unit in service.
Work like a Pro!
Pros weld and cut
safely. Read the
safety rules at
the beginning
of this manual.
OM-274462 Page 23
Input2 2012−05