Aquapeutics Mazatlan Manuel d'installation - Page 3
Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} Aquapeutics Mazatlan. Aquapeutics Mazatlan 15 pages.
Please note: If you have purchased aTub with the additional heater option it is very important to understand
that the electrical requirements for your unit have changed. The heater requires a second separate electrical
circuit that can supply13 amps at 110 volts with GFI in addition to what your tub had originally needed.
Installation instructions for your optional heater are in the installation section of this manual.
1.2Package information
1. Upon the arrival of your Aquapeutics spa take care to make a
thorough inspection for any visible damage to the shipping
container. Visible damage should be reported toyour carrier
immediately. All SHIPPING DAMAGE should be noted on the
assigned shipping document.
2. It is recommended that all rough plumbing and electrical work be
completed before the assembly of your Mazatlan begins.
3.At least two people are required to lift the larger pieces into
position during installation.
1
2
3
1.TOP COVER (ROOF) 2. LEFT SIDE PANEL 3. BATHTUB 4.RIGHT
SIDE PANEL
7. and 7A MOVABLE GLASS DOOR (That is now 2 sections that must be
assembled as noted in a later part of this manual.)
5
4
5.BACK PANEL
Page 2
6
6.STATIONARY GLASS DOOR
7
7