Aquaport AQP-BM4 Manuel d'installation et d'utilisation - Page 6
Parcourez en ligne ou téléchargez le pdf Manuel d'installation et d'utilisation pour {nom_de_la_catégorie} Aquaport AQP-BM4. Aquaport AQP-BM4 12 pages. Deluxe collection water cooler cold and room
A. Water Cooler Installation for Spring Water bottles.
Please follow the instructions below if you are using a spring
water bottle.
Do not turn on the water cooler until the following instruction
have been followed.
1. Vertically insert a spring water bottle into the bottle support
on top of the water cooler, the spike will pierce the bottle cap.
You will see bubbles appear inside the bottle, wait until the
bubbling has stopped before dispensing water from both taps.
Note: If you are applying a spring water bottle to the water cooler
for the fi rst time and you do not see any bubbles appear inside
the bottle, open both taps until the bubbling starts and water
fl ows from both taps. Refer to the trouble shooting guide for more
information.
2. Once the bubbling has stopped, drain 1-2lts of water
from both taps.
Note: The water cooler has been fl ushed before it left the factory
however we strongly recommend 2-3lts of water is fl ushed through
the unit before using.
3. Insert the power plug into the wall socket, and turn the power/
cooling switch ON. The power/cooling switch is situated at the
rear of the unit.
4 INSTALLATION AND OPERATING INSTRUCTIONS
4. At the front of the unit there are 3 indicator lights, the POWER
light will continually illuminate while the unit is turned on.
The COOLING light in the middle will illuminate when the
compressor is running and cooling the water. When cooling is
fi nished the COOLING light will turn off and the COLD auxiliary
light will illuminate until cooling is required again.
5. When the unit is turned on for the fi rst time, allow the unit to
cool the water for 1-2 hours before dispensing cold water.