Aquasana High-Flow Pro Series Manuel - Page 4

Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} Aquasana High-Flow Pro Series. Aquasana High-Flow Pro Series 8 pages.

Aquasana High-Flow Pro Series Manuel

Installation

1. Shut off water supply and select a mounting location
a) The location should allow for a minimum clearance of 2 ½ inches under the cartridge(s)
so they can be removed and replaced.
b) Provide adequate space on both sides for plumbing and also for system flushing.
2. Install gauges provided onto manifolds as shown
3. Install "T" fitting and drain shut-off valve onto outlet port ¾" NPT
4. Install manifold bracket onto wall
a) Use level and predrilled mounting holes in
the manifold bracket as guides.
b) Mark and drill anchor holes.
c) Ensure that bracket is mounted level and securely.
*Use Teflon
tape
®
Note:
Entry gauge goes
on front pipe.
Exit gauge goes
on back pipe.
*Use Teflon
CAUTION!
DO NOT
OVER-TIGHTEN
gauges or
connections
tape
®