AquaScape BIOFALLS 1000 Instructions et entretien - Page 7
Parcourez en ligne ou téléchargez le pdf Instructions et entretien pour {nom_de_la_catégorie} AquaScape BIOFALLS 1000. AquaScape BIOFALLS 1000 16 pages.
Également pour AquaScape BIOFALLS 1000 : Instructions et entretien (16 pages)
STEP 6
BRING IN THE TOPSOIL
• Add topsoil to the berm and surrounding area in order to
provide a good substrate for future landscape planting.
STEP 7
BUILD THE RETAINING WALL
• Finish off the berm where the BioFalls
building a small retaining wall out of boulders. This step
may or may not be needed, depending on the size of the
berm and the transition into the existing landscape.
www.aquascapeinc.com |
is buried by
®
CAN 1-866-766-3426 |
STEP 8
PLUG IN AND TWEAK THE WATERFALLS
• As soon as the pond is fi lled and all of the Pond & Waterfall
Foam is dry, you may plug the pump in and test the
waterfall.
WARNING
Any electrical should be plugged into a GFCI rated
receptacle.
• You can tweak the waterfall fl ow by placing smaller stones
and gravel on the waterfall cascades. This will change the
appearance and sound of the water. Have fun playing with
the fl ow of water coming over the falls until you achieve the
desired effect.
STEP 9
TRIM THE LINER
With everything running, go around the perimeter of the
pond with a pair of scissors and trim off any excess liner,
always leaving several inches above the water level as a
precaution. The remaining liner edges can be covered with
gravel.
NOTE: Do not trim the liner until the waterfall is running and the
pond is fi lled to the desired level. Prematurely trimming the liner
may cause leaks!
Trim off any excess liner.
STEP 10
MULCH THE BERM
• The entire area surrounding the BioFalls
mulched and any surrounding plants added.
US 1-866-877-6637
Cover remaining liner edges with
gravel.
can now be
®
7