EPHREM LE GASTRONOME PRO Instructions de montage

Parcourez en ligne ou téléchargez le pdf Instructions de montage pour {nom_de_la_catégorie} EPHREM LE GASTRONOME PRO. EPHREM LE GASTRONOME PRO 2 pages.

L E G A S T R O N O M E
Cut the first insulation panel
according to the instructions
provided, part C is no longer
needed.
EXPLODED VIEW
WARNING: DO NOT USE ALCOHOL, GASOLINE, OR SIMILAR FLAMMABLE LIQUIDS TO IGNITE OR REKINDLE THE FIRE.
P R O
Placement of the cut insulation panels
Full insulation panel
Full insulation panel
Create a layer of lean
mortar (non-refractory)
using a ratio of 1 dose
normal cement to 6
doses of O/4 mm sand.
Total weight: 410kg
Packaged on a pallet
measuring 100×120 cm
Insulation panel
View from above
A S S E M B LY I N S T R U C T I O N S
Step 1:
Trim elements if needed with a wood rasp.
Step 2:
On a metal support table with minimum dimensions of 132 (width) x 126
(depth) cm, arrange the insulation panels
depicted in Figure 3 and assemble them as demonstrated in Figure 2. Create a
base layer of
lean mortar
thick. Place the 17 pieces of the previously moistened slab floors
mortar, following the arrangement shown in Figure 1. Ensure there are no gaps
between the pieces and that the upper surface is level. Remove any excess mortar
from the perimeter of the hearth.
before proceeding.
Step 3:
Place the front element
Step 4:
Assemble the elements in the specified order
mortar.
Step 5:
Apply a layer of
resulting crown ⑦. Without delay, position the arches
Finally, seal the smoke drain
Step 6:
Secure the oven diagonally by attaching a metal strip
least 3 cm to the support table ⑬. Follow the configuration depicted in Figure 4.
Step 7:
The symbol
connection pipe (available as an optional accessory) and connecting a stainless
steel flue with a diameter of Ø200 mm.
Step 8:
To insulate the oven, use a roll of EPHREM fibre insulation, which is
available as an optional accessory. Start by applying a single layer of the insulation
material and then add additional layers in a criss-cross pattern. Finally, install a
metal casing around the oven to provide further insulation and protection.
Step 9:
Lastly, position the Cast Iron Facade with double swing door in front of the
oven opening. Securely fasten the screws (provided) into the wall plugs until they
are firmly in place, and then use a spanner to give them a quarter turn. This
tightening method prevents any damage to the concrete.
according to the cutting pattern
using standard cement ⑤, approximately 2 to 3 cm
Allow the hearth to dry for 24 to 48 hours
in the indicated position.
refractory mortar
that is 1 to 2 cm thick on the top of the
using refractory mortar.
represents the chimney, which can be created by using a
T R U C K
on top of the
② ③
④, without any joint
and
onto the mortar.
with a width of at