Olympus MU-1 Manuel d'entretien - Page 8

Parcourez en ligne ou téléchargez le pdf Manuel d'entretien pour {nom_de_la_catégorie} Olympus MU-1. Olympus MU-1 28 pages. Maintenance unit
Également pour Olympus MU-1 : Manuel d'instructions (36 pages)

MU-1
(1)
OES scopes and EVIS scopes can be used.
(2)
Unless the AW channel cleaning adapter, leak tester and chemical tank are used, draining
water from the air and water channel, leak inspections and feeding rubbing alcohol for
drying the OES scope and EVIS scope are not possible.
(3)
In order to drain the water feeding channel, cover the water supply connector with a finger.
(Same as with the former model.)
(4)
The ambient operation conditions are as follows:
a) Temperature: 10 to 40 ºC
b) Humidity: 30 to 85%
c) Atmospheric pressure: 700 to 1060 hPa
d) Not to be used in an atmosphere with inflammable gases.
(5)
The power supply conditions are as follows:
a) Rated power supply voltage: 100 V, 120 V, 220 to 240 V (according to the intended
market)
b) Rated input current: 0.4 A, 0.4 A, 0.2 A
c) Frequency: 50/60 Hz
d) Allowed voltage fluctuation: ±10%
Product Outline

3. Restrictions

1-2
ISSUE6