Commissioning Procedures
Storage PV Capacity
Click "Submit" when the settings
are complete.
Hybrid Mode
Three mode options:
Hybrid
PV capacity on the PV-inverter (on-grid) side
Storage PV capacity: PV capacity on the energy storage inverter side
5 kW
On the grid side, if only a CT is installed, please select CT for grid side.
If the grid meter is installed, please select Meter for grid side. If this
meter is a CT meter and the CT ratio is not 1, please select CT below and
input the Meter CT Ratio. If this meter is not a CT meter or the CT ratio
is 1, please do not select CT below.
Note:
When the safety standard is set as AS4777.2 (Australia and New
Zealand), the secondary sub-options can be selected according to the
region or local grid company.
You can set the allowable feed-in ratio from 0%-100%.
DC/AC/Hybrid
7