AlphaESS SMILE-G3-EVCT11 Manuel d'installation, d'utilisation et d'entretien - Page 4

Parcourez en ligne ou téléchargez le pdf Manuel d'installation, d'utilisation et d'entretien pour {nom_de_la_catégorie} AlphaESS SMILE-G3-EVCT11. AlphaESS SMILE-G3-EVCT11 14 pages.

INTRODUCTION

1.4 Product Overview

03
04
02

Mounting

2.1 Package Verification
After receiving the charger, please unpack and check the following items:
• Inspect the external appearance and notify the seller immediately if there is any
damage.
• Check the accessory type and quantity. If the quantity and/or type is incorrect, record
it

2.2 Installation Preparation

2.2.1 Tools
Tool Name
Multimeter
Cross Screwdriver
(PH2x150mm, PH3x250mm)
Insulated Torque Wrench
Electric Drill
Diagonal Pliers
2.2.2 Cables & Materials
Name
Power supply cable
Photo
Check the electrical connection and
electrical parameter
Tighten the screws
Tighten the bolts
Drill holes in the wall
Cut cables
Specification
5*6mm² three-phase
Depends on the actual
power supply cable
requirement
MOUNTING
Function
Quantity