ABB ACH550 series Manuel de démarrage rapide - Page 4

Parcourez en ligne ou téléchargez le pdf Manuel de démarrage rapide pour {nom_de_la_catégorie} ABB ACH550 series. ABB ACH550 series 6 pages. Pumpsave 4.1, energy savings calculator for pump drives
Également pour ABB ACH550 series : Manuel de l'utilisateur (14 pages), Manuel d'installation, d'utilisation et d'entretien (18 pages)

ABB ACH550 series Manuel de démarrage rapide
Step 6: On the back plane of the board and plastic housing push the 4 tabs that hold the board in place away from the
control board (SMIO-01). Lift board and slide it out of the plastic cover of board enclosure.
Step 7: Remove small ribbon cable connector from control board (SMIO-01). You keep the existing ribbon cable with 40
pin connector in place.
Step 8: Mount the 64652745 (OPEX-01 Interface Board) onto the control board (SMIO-01). The 64738852 – Connection
Cable connects to the 8-pin connection on the 64652745 (OPEX-01 Interface Board) and the RJ45 connector of the
64738852 connects to the removed control panel (SMIO-01) through the cutout on the 64652745 (OPEX-01 Interface
Board).
LVD-EOTKN094U-EN REV A
Effective: 2022-06-30
4