Cinier Greenor Instructions de montage - Page 5
Parcourez en ligne ou téléchargez le pdf Instructions de montage pour {nom_de_la_catégorie} Cinier Greenor. Cinier Greenor 9 pages. Fan coil
![Cinier Greenor Instructions de montage](/uploads/products/server2/449039/449039.jpg)
4 - Hydronic connection of the rough
(Drawings No 1 and 2)
Stretch the flexible hoses completely and form an arch
to better adapt to necessary length when connecting.
Connect both supplied flexible hoses to the water
inlets; Respect the inlet /outlet flow as per drawings.
Verify all hydronic connections and gaskets (Drawings
No 1 and 2).
For the reversible system, insulate the gaskets and
flexible hoses. Connect the condensate line to the
waste pipe; use a condensate draining lifting pump
when necessary.
Mounting of draining / lifting pump
Place the support of the pump using 2 screws of
3x10mm
Glide the pump on the rubber-rail
Connect the electrical plug.
Connect the air outlet
Connect PVC evacuation tub drain pipe 6x9mm /
5/16" X 3/8"
Location at the bottom for electrical connection
Fixation for lifting pump only for reversible system
Connection box, connecting terminal,
(see picture No 4)
Picture No 1
Picture No 2
Picture No 3
Picture No 4