ABB ScreenMaster RVG200 Manuel - Page 6
Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} ABB ScreenMaster RVG200. ABB ScreenMaster RVG200 17 pages. Paperless recorder terminal block failures
Également pour ABB ScreenMaster RVG200 : Instructions de mise en service (17 pages), Procédure de remplacement des piles (4 pages), Manuel (2 pages), Instruction de service (2 pages)
6
S C R E E N M A S T E R R V G 2 0 0 / PA P E R L E S S R E C O R D E R | C I/ R V G 2 0 0/0 0 1 - E N R E V. A
... 3 Electrical connections
Accessing the recorder connection terminals
Referring to Figure 3:
1 Press the terminal cover release plate in recess
terminal cover
B
away from the recorder body to expose the
terminal connections.
Figure 3 Accessing the recorder connection terminals
Power supply connections
Referring to Figure 4:
1 Make connections to the power supply terminals
A
and pull
(module position E) as follows:
– AC supply: terminals 1 (line), 2 (neutral), 3 (ground)
or
– DC supply: terminals 4 (+), 5 (–)
IMPORTANT (NOTE)
Tighten terminal screws to a torque of 0.1 Nm
(0.9 lbf.in).
Figure 4 Power supply connections and fuse ratings
Module positions
A
B
C
D
AC Supply
Fuse
Line
1
L
Neutral
2
N
3
Warning. Use fuse rating 500 mA (maximum) Type T IR
(UL category JDYX2)
DC Supply
3
Fuse
4
+
–
5
Warning. Use fuse rating 2.5 A (maximum) Type T
AC power
supply earth
(ground) stud
E
Power
1
supply
2
3
terminals –
4
see below
5
100 to 240 V AC
50 / 60 Hz
24 V DC