Sharp SJ-21P-GY Manuel d'entretien - Page 14

Parcourez en ligne ou téléchargez le pdf Manuel d'entretien pour {nom_de_la_catégorie} Sharp SJ-21P-GY. Sharp SJ-21P-GY 28 pages.

Sharp SJ-21P-GY Manuel d'entretien
SJ-21P
SJ-D25P

ASSEMBLING PROCEDURES OF MAIN PARTS AND CAUTIONS

CAUTION: DISCONNECT THE UNIT FROM THE POWER SUPPLY BEFORE ANY REPAIRING.
1. F-LOUVER ASSEMBLY
F-louver sealer
F-louver
F control label
F temp. control knob
1. Stick E.V. duct AL to E.V. duct insulation.
Sec. AA
Fig. A-2
2. Stick A-sealer EVC A & A-sealer EVC B to E.V. duct
insulation.
3 ~ 5 mm
(102 mm)
View from C
Fig. A-3
A-sealer EVC B
Fig. A-1
E.V. duct AL
A-sealer EVC A
E.V. duct AL
3 ~ 5 mm
Aluminum tape
(65mm x 290mm, 65mm x 125mm)
E.V. duct AL
E.V. duct insulation
A-sealer EVC A
A
A
C
3. Stick F control label to F-louver.
(Note) Do not fix F-control label upside down.
4. Insert F-temp. control knob to F-louver.
F-temp. control knob
a
F-louver
b
F-temp. control knob
14
F-control label
F-louver
Fig. A-4
a
b
D
B
D
B
b
F-louver
a
Sec. DD
Sec. BB
Fig. A-5