Shimano ALFINE Inter-8 Manuel du distributeur - Page 19
Parcourez en ligne ou téléchargez le pdf Manuel du distributeur pour {nom_de_la_catégorie} Shimano ALFINE Inter-8. Shimano ALFINE Inter-8 49 pages.
INSTALLATION
Installation of the shift lever
Installation of the shift lever
1
2
(A)
Installation of the shifting cable
For internal 8-speed
Shift lever side
1
To be continued on next page
Mount the shift lever to the handlebar.
(z)
Φ22.2
(z)
Mount the grip to the handlebar and
secure the shift lever.
Set the shift lever to 8 .
19
NOTICE
Use a handlebar with an outer diameter of
Φ22.2 mm.
(A)
4 mm hexagon wrench
Tightening torque
5 - 7 N·m
NOTICE
Use a handlebar grip with a maximum outer
diameter of Φ32 mm.
NOTICE
•
Use a shifting cable with one inner cable
drum.
Cable with one inner cable drum: OT-SP41
•
Make sure that the shield cap is at the shift
lever end.