Shimano SG-8C20 Manuel d'entretien - Page 22

Parcourez en ligne ou téléchargez le pdf Manuel d'entretien pour {nom_de_la_catégorie} Shimano SG-8C20. Shimano SG-8C20 36 pages. Inter-8 coaster hub
Également pour Shimano SG-8C20 : Instruction de service technique (4 pages)

Shimano SG-8C20 Manuel d'entretien
4.
Install the ball retainer P
(3/16"X13).
5.
When installing the right hand
cone, align the two serrations
with the grooves in the axle,
as shown. Set the cone instal-
lation tool (TL-8S20) and strike
it until it comes to a stop.
NOTE:
Make sure the right hand cone is
completely seated, as shown, and
the seal is installed equally.
6.
Install the driver plate. Be
careful of the setting direction
as shown in the picture.
22
Driver plate
(Y-34R 12000)
Ball retainer P
(Y-34R 98070)
(Y-041020800)
Right hand cone
(Y-34R 98080)
seal
seal
ok
Tool TL-8S20
(Y-708 00200)
ok