Siemens SIVACON Manuel d'installation - Page 29
Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} Siemens SIVACON. Siemens SIVACON 34 pages. Distribution systems installation and maintenance instructions for power factor correction (pfc) capacitors
Maintenance
8.1
Disposal of waste electronic equipment
Disposal of waste electronic equipment
Waste electronic equipment must not be disposed of as unsorted municipal waste, e.g.
household waste. When disposing of waste electronic equipment, the current local national/
international regulations must be observed.
Maintenance
Disregarding the following measures may result in severe operation failures, bursting and fire.
• Check tightness of the connections/terminals periodically, two weeks after installation at
• Clean the terminals / bushings periodically to avoid short circuits due dust or other
• Check the short circuit protection fuses.
• Take current reading twice a year and compare with nominal current. Use a harmonic
• In case of a current above the nominal current check your application for modifications.
• If a significant increase in the amount of non-linear loads is detected, a consultant has to be
• In cases of the presence of harmonics, the installation of a de-tuned capacitor bank
• Check the discharge resistors / reactors and in case of doubt check their function:
1. Power the capacitor up and down.
2. After 60 seconds the voltage between the terminals must decline to less than 75 V. Please
• Check the temperature of energized capacitors. In case of excessive temperature of
Note
Please note again that these "Installation and Maintenance Instructions" apply to typical
specifications. Refer to our product specifications, or request our approval for your specification
before installing a capacitor.
Installation and maintenance instructions for Power Factor Correction (PFC) capacitors
Installation Manual, 05/2022, L1V30884033A
CAUTION
the latest, and then once every month.
contamination.
analyzer or true effective RMS-meter.
called in for a harmonic study.
(reactors) must be considered.
note that for specific types discharge time is 180 seconds.
individual capacitors, it is recommended to replace this capacitor, as this could be an
indication for loss factor increase which is a sign for reaching end of life.
8
29