Cisco ASR1006 - ASR 1006 Modular Expansion Base Manuel d'installation du matériel - Page 23
Parcourez en ligne ou téléchargez le pdf Manuel d'installation du matériel pour {nom_de_la_catégorie} Cisco ASR1006 - ASR 1006 Modular Expansion Base. Cisco ASR1006 - ASR 1006 Modular Expansion Base 47 pages. Lightweight access points
Également pour Cisco ASR1006 - ASR 1006 Modular Expansion Base : Manuel de déploiement (40 pages)
![Cisco ASR1006 - ASR 1006 Modular Expansion Base Manuel d'installation du matériel](/uploads/products/server2/564245/564245.png)
Figure 19
DC Power Supply Terminal Block Positive and Negative Connections (ASR1006-PWR-DC)
Tighten the Kepnut screw to recommended torque of 18 in-lbs minimum to 22 in-lbs maximum for the positive stud
Step 5
and wire.
Note
Secure the wires coming in from the terminal block so that they cannot be disturbed by casual contact.
Step 6
Use tie wraps to secure the wires, so that the wires are not pulled from the terminal block by casual contact. Tie-wrap
studs are located below the power supply terminal block.
Step 7
Replace the terminal block plastic cover, and tighten the screw. The plastic cover is slotted and keyed to fit correctly over
the terminal block.
Caution
Secure the wires coming in from the terminal block to ensure that they cannot be disturbed by casual contact. Tabs
are located on the base of the DC power supply to which you can secure the ties.
Use tie wraps to secure the wires to ensure that the wires are not pulled from the terminal block by casual contact. The
Step 8
DC power supply has tie-wrap tabs to aid in securing the wires. Make sure the tie wrap allows for some slack in the
ground wire.
See
Figure 12
if you are using the ASR1006-PWR-DC power supply.
See
Figure 13
if you are using the ASR1013/06-PWR-DC power supply.
Step 9
Switch the circuit breaker switch to the On (|) position .
Note
The requirement for maximum torque applied to the power or ground Kepnuts must be 8 in-lb when the power or
ground lug is not present.
This completes the procedure for connecting DC-input power. Your installation is complete. Proceed to the
Supply Operation" section on page 24
to start the router.
"Verifying Power
23