Argo DRY BABY 11 Manuel d'utilisation - Page 5
Parcourez en ligne ou téléchargez le pdf Manuel d'utilisation pour {nom_de_la_catégorie} Argo DRY BABY 11. Argo DRY BABY 11 6 pages.
Également pour Argo DRY BABY 11 : Manuel d'utilisation (8 pages), Manuel d'utilisation (10 pages)
CONTINUOUS CONDENSATE DRAINAGE
The water removed from the air can be collected in the special tank on the lef side of the
appliance (to empty the tank when full, follow the instructions in the paragraph TANK FULL ALARM
LED), or it can be drained continuously using a PVC hose (not supplied).
When you wish to use this function, remove the
water tank and connect the PVC hose to the continuous
drainage opening.
The PVC hose should be positioned horizontally under the
level of the drainage opening.
Avoid uneven floors and bending the hose.
Next, reposition the tank.
Connect the hose to a continuous drainage channel.
MAINTENANCE FOR THE EXTERIOR SURFACE OF THE DEHUMIDIFIER
Warning
Always unplug the appliance before cleaning it, otherwise electric shocks and malfunctions may
occur.
Warning
Do not wet the appliance or immerse it in water, otherwise electric shocks may occur.
Use a damp and soft cloth to clean the exterior surface of the dehumidifier.
Do not use solvents, petrol, xylene, talcum powder or brushes: these products may damage the
surface or alter the casing colour.
CLEANING THE AIR FILTER
The filter is designed to remove dust or dirt from the air.
If the filter is clogged by dust, electricity consumption
will be higher than normal.
To optimise humidity removal efficiency, clean the filter
once a fortnight.
Cleaning instructions:
1. Remove the tank; grip the lower part of the filter and
pull downwards to remove it completely.
2. Clean the filter using a vacuum cleaner or wash it
with clean water at a temperature below 40°C. DO
NOT USE ALCOHOL, BENZENE OR OTHER AGGRESSIVE
PRODUCTS.
3. Leave the filter to dry naturally, then reposition it in the
relevant slot.
V 02/13
CLEANING AND MAINTENANCE
PVC HOSE FOR
CONNECTION TO
THE OPENING (not
supplied)
CONTINUOUS
DRAINAGE OPENING
11