Cisco Firepower 4110 Manuel - Page 17

Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} Cisco Firepower 4110. Cisco Firepower 4110 26 pages. Rack-mount and ground the chassis
Également pour Cisco Firepower 4110 : Manuel de maintenance et de mise à jour (20 pages), Manuel (36 pages), Manuel (8 pages), Manuel (42 pages), Pour commencer (42 pages)

Cisco Firepower 4110 Manuel
Installation, Maintenance, and Upgrade
Figure 7: Remove the M5 Screws
Step 7
For easier cable management, insert the negative lead cable first. Replace the grounding lug with the cable in the
following order—wire terminal, then the screw with the captive washer.
Figure 8: Insert the Cables
Step 8
Tighten the M5 screw with the captive washer to the recommended torque of 5 in-lbs for the positive stud and wire.
Secure the wires coming in from the terminal block so that they cannot be disturbed by casual contact.
Connect the DC Power Supply Module
Installation, Maintenance, and Upgrade
17