Cisco UCS B260 M4 Note d'installation et d'entretien - Page 31
Parcourez en ligne ou téléchargez le pdf Note d'installation et d'entretien pour {nom_de_la_catégorie} Cisco UCS B260 M4. Cisco UCS B260 M4 50 pages. Blade server
Également pour Cisco UCS B260 M4 : Note d'installation et d'entretien (46 pages)
Servicing the Blade Server
e) Lift the tool and CPU straight up off of the pedestal.
Figure 12: Loading the Pick and Place Tool
1
Step 4
Place the CPU and tool on the CPU socket with the registration marks aligned as shown.
Step 5
Press the button/handle on the pick and place tool to release the CPU into the socket.
Cisco UCS B260 M4 and B460 M4 Blade Server Installation and Service Note for Servers with E7 v3 and E7 v2 CPUs
Installing a New CPU and Heat Sink
Alignment mark on the pick and place tool, CPU
and pedestal
23