b4Adventure SLA.826 Manuel - Page 3
Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} b4Adventure SLA.826. b4Adventure SLA.826 5 pages.

3. INSTALL THE WALL
•
Use a stud finder and mark the location of 3 adjacent studs on the wall where the climbing wall will
hang. Attach the 8 ft long 2 x 4's to the studs with 3 in. #9 screws. Framing studs will run vertically
every 16 inches behind each wall, as well as at the top and bottom, to form the framework. An
eight-foot wide wall will require nine studs - seven vertical studs spaced 16 inches apart as well as a
top plate and bottom plate (Figure 7).
• While short, vertical walls can be framed with 2"x 4" studs, overhanging walls must use wider, stron-
ger framing materials. The required size of framing materials is determined by both their span and the
load they must bear. Slightly overhanging walls should use 2"x 6" or 2"x 8" studs
• Line up your panel against the strips and secure it to the strips with 3 in #9 screws (Figure 8).
• Use sandpaper to smooth out any rough edges or splinters.
Figure 7
Figure 8
FINAL WALL SET UP
b4Adventure 4010 Holly Street Unit 16 • Denver Colorado 80216 • 1-844-834-4334 QUESTIONS?
[email protected] · www.b4adventure.com 303-339-0482 - DC:080818
3